Our works

Location and entry into operation: Roverè Veronese (VR) – 2018
Type: partially integrated
Installation: Mixed with flat roof and pitch
Total nominal power and producibility: 947.97 kW – 1,103,437.08 kWh/a
Panels used: Sunpower 327 COM
Transformation groups: 14 TRIO-50.0-TL-OUTD-POWER-MODULE + 1 TRIO-27.6-TL-S2X
Environmental impact: 630 Tons of Co2/year avoided.

Location and entry into operation: Modugno (BA) – 2013
Type: partially integrated + integrated shelters
Installation: Flat roof
Total nominal power and producibility: 284.66 kW – 380,000 kWh/a
Panels used: 1129 Solon Black 220/16 of 250/255 w
Conversion groups: 9 Power One Trio 27.6 TL S2F
Environmental impact: 217 Tons of Co2/year avoided.

Location and entry into operation: Soliera (MO) – 2012
Type: partial architectural integration
Installation: Eternit disposal and installation on a corrugated sheet with tubs
Nominal power and producibility: 192 kW – 194,040 kW/a
Panels used: 800 Schott Solar Poly 240 EU
Transformation Groups: 4 Power One Trio 27.6 – 4 Power One Trio 20.0
Environmental impact: 103 Tons of Co2/year avoided.

Location and entry into operation: San Martino Buon Albergo (VR) – 2012
Type: partial architectural integration
Installation: on shed cupels
Rated power and producibility: 118.80 kW – 130,900 kW/a
Panels used: 495 Schott Solar Poly 240 w
Transformation groups: 4 Power One Trio 27.6 OUTD-FS-IT
Environmental impact: 63 Tons of Co2/year avoided.

Location and entry into operation: San Martino Buon Albergo (VR) – 2012
Type: partial architectural integration
Installation: on shed cupels
Nominal power and producibility: 99.12 kW – 109,000 kW/a
Panels used: 413 Schott Solar Poly 240 w
Transformation groups: 3 Power One Trio 27.6 OUTD-FS-IT – 1 Power One Trio 20.0 OUTD-FS-IT
Environmental impact: 60 Tons of Co2/year avoided.

Location and entry into operation:  VERONA (VR) – 2010
Type: total architectural integration
Installation: on a flat-rail structure designed and supplied by SInergi s.r.l. for integration
Nominal power and expected producibility: 148.48 kW – 151,000 kWh/year c.a.
Panels used: n. 640 SCHOTT SOLAR modules of 230 W.
Transformation groups: 3 INGETEAM SUN POWER inverters; 1 BONFIGLIOLI 120 inverter
Environmental impact: 91 Tons of Co2/year avoided.

Location and entry into operation:  VERONA (VR) – 2013
Type: total architectural integration
Installation: 10° inclination of the structure made up of aluminum profiles fixed to the curved cupel and to the module
Nominal power and expected producibility: 141.75 kw – 143,000 kWh/year c.a.
Panels used: n. 557 BENQ 255W modules.
Transformation groups: 3 POWERONE 27.6 inverters–2 POWERONE 20.0 inverters–1 POWERONE 12.5 inverter
Environmental impact: 87 Tons of Co2/year avoided.

Location and entry into operation:   VERONA (VR) – 2010
Type: total architectural integration
Installation: on a tile roof
Nominal power and producibility: 94,390 Wp – 106,000 kWh/year c.a.
Panels used: n. 414 SUNPOWER S228P-E13 modules of 228 W.
Transformation groups: 1 BONFIGLIOLI 120 centralized inverter
Environmental impact: 61 Tons of Co2/year avoided.

Location and entry into operation: BERGANTINO (RO) – 2011
Type: total architectural integration
Installation: on pitched roofs with Ethernit disposal
Nominal power and producibility: 195.50 Wp – 198,755 kWh/year c.a.
Panels used: n. 850 SCHOTT SOLAR PERFORM POLY 230 polycrystalline modules
Transformation groups: 2 SANTERNO Sunway TG 26 inverters; 2 SANTERNO Sunway TG 90 inverters
Environmental impact: 105 Tons of Co2/year avoided.

Location and entry into operation:  SAN PIETRO IN CARIANO (VR) – 2010
Type: partial architectural integration
Installation: on a triangular structure designed and supplied by Sinergi s.r.l.
Nominal power and expected producibility: 123.12 kW – 136,000 kWh/year c.a.
Panels used: n. 513 240 W ISOFOTON modules.
Transformation groups: 1 Bonfiglioli 120 inverter
Environmental impact: 70 Tons of Co2/year avoided.

Località ed entrata in esercizio: San Pietro In Cariano (VR) – 2011
Tipologia: parziale integrazione architettonica
Installazione: tetto piano
Potenza nominale e producibilità:  54,00 kW – 59.000 kWh/anno c.a.
Pannelli utilizzati: n. 228 moduli monocristallini ISOFOTON ISF Mono 240w
Gruppi di trasformazione: 1 inverter BONFIGLIOLI – modello RPS4500
Impatto ambientale: 35 Tonnellate Co2/anno evitate.

Location and entry into operation: Porto Garibaldi (FE) – 2013
Type: partially integrated
Installation: on a pitched roof with an aluminium/stainless steel structure anchored to the top of the corrugation
Rated power and producibility: 55.86 kW – 67,200 kW/a
Panels used: 228 Solon Blue 220/16 of 245 w
Transformation groups: 2 Kako Powador 30.0 TL3
Environmental impact: 32 Tons of Co2/year avoided.

Location and entry into operation: Settimo di Pescantina (VR) – 2012
Type: partial architectural integration
Installation: installation on corrugated sheet
Nominal power and producibility: 11.76 Wp – 12,900 kW/a
Panels used: 40 Solon Blue 230/07 of 245 W
Transformation groups: 1 Power One 12.5 OUTD IT
Environmental impact: 7 Tons of Co2/year avoided.

Location and entry into operation:  SANTA MARIA DI SALA (VE) – 2010
Integration: partial architectural integration
Installation: on triangular structure designed and supplied by SInergi s.r.l.
Nominal power and producibility: 19.40 kW – 220,000 kWh/year a.c.
Panels used: n. 81 ISOFOTON modules of 240 W.
Transformation groups: 3 INGECON SUN 5TL inverters
Environmental impact: 10 Tons of Co2/year avoided.

Location and entry into operation: Bibbona (LI) – 2010
Type: Total integration on the shelter
Installation: on a shelter designed and supplied by Sinergi s.r.l.
Expected producibility: 198 Wp. – 246,750 kWh/year a.c.
Modules used: Centrosolar 235 W.
Transformation groups: Bonfiglioli
Environmental impact: 132 Tons of Co2/year avoided

Location and entry into operation: VERONA (VR) – 2010
Type: total architectural integration
Installation: on steel roofing
Nominal power and producibility: 41,480 Wp – 41,000 kWh/year c.a.
Panels used: n. 288 UNISOLAR PVL-144 thin film modules of 144 W.
Transformation groups: 4 INGECON SUN 10 three-phase inverters
Environmental impact: 22 Tons of Co2/year avoided.

Location and entry into operation:  SETTIMO DI PESCANTINA (VR) – 2010
Type: partial architectural integration
Installation: on a triangular structure designed and supplied by Sinergi s.r.l.
Nominal power and expected producibility: 63.00 kW – 70,000 kWh/year c.a.
Panels used: n. 220 SUNPOWER SER228P E13 228W modules; n. 60 SUNPOWER SER220P 220W modules
Transformation groups: 2 BONFIGLIOLI inverters
Environmental impact: 33 Tons of Co2/year avoided.

Location and entry into operation: Settimo di Pescantina (VR) – 2010
Integration: total architectural integration
Installation: Asbestos disposal and roof installation with Greek key to integrate the module.
Nominal power and expected producibility:  19.80 kW – 22,572 kWh/year c.a.
Panels used: n. 81 ISOFOTON ISF 235 modules
Transformation groups: 3 INGETEAM inverters – Ingecom Sun Lite model
Environmental impact: 12 Tons of Co2/year avoided. avoid.

Location and entry into operation: San Candido (BZ) – 2009
Installation: Pitched roof
Nominal power and producibility: 10.34 kWp – 9100 kWh/year a.c.
Panels used: Unisolar PVL136
Transformation groups:  Inverter Elettronica Santerno TG
Environmental impact: 5.41 Tons of Co2/year avoided

Location and entry into operation: Pescantina (VR) – 2011
Installation: flat roof
Nominal power and producibility: 50.40 Wp – 56,952 kWh/year a.c.
Panels used: n. 221 SOLON BLACK 240w monocrystalline modules
Transformation groups: 4 POWER ONE inverters – Mod. 12.5 OUTD IT
Environmental impact: 30 Tons of Co2/year avoided.

Location and entry into operation: San Martino Buon Albergo (VR) – 2013
Type: partially integrated
Installation: Flat roof
Rated power and producibility: 12.00 kW – 13,200 kW/a
Panels used: 48 JASOLAR JAP6-60 250w
Transformation groups: 1 Kaco Powador 14.0 TL
Environmental impact: 8 Tons of Co2/year avoided.

Location and entry into operation: Isola Rizza (VR) – 2013
Type: partially integrated
Installation: integrated shed on pitched roof with asbestos disposal
Rated power and producibility: 50.00 kW – 58,750 kW/a
Panels used: 198 BenQ Solar 250W
Transformation groups: 2 Power One Trio 27.6 S2X-400 – 1 Power One Trio 20.0 S2X-400
Environmental impact: 31 Tons of Co2/year avoided.

Location and entry into operation: Buttapietra (VR) – 2009
Type: flat roof
Installation: on a triangular structure
Nominal power and producibility: 19.53 kWp – 24,823 kWh/year
Panels used: 210 Watt SunPower 210 WHT
Transformation groups:  Elettronica Santerno
Environmental impact: 13.16 Tons of Co2/year avoided